Leave space for the work after delivery.
Installation choices should support inspection and repeatable operation.
Plan physical access
Check how screens, working elements, seals and other service parts are removed in the actual room layout.
- Include lifting and maintenance clearances.
- Verify access around connected pipework.
- Keep drains and inspection points reachable.
Verify the installed boundary
Compare the installed machine and connections with the agreed drawings before relying on trial or cleaning results.
- Identify the fitted contact parts.
- Confirm utilities and safe isolation.
- Record any configuration substitutions.
Maintain the evidence
Changes to screens, seals or working elements can change the product path. Keep maintenance records tied to the configuration used for acceptance.
- Inspect wear by the supplier’s instructions.
- Track replacement part identity.
- Revisit quality checks when configuration changes.