Leave space for the work after delivery.

Installation choices should support inspection and repeatable operation.

01 / Project note

Plan physical access

Check how screens, working elements, seals and other service parts are removed in the actual room layout.

  • Include lifting and maintenance clearances.
  • Verify access around connected pipework.
  • Keep drains and inspection points reachable.
02 / Project note

Verify the installed boundary

Compare the installed machine and connections with the agreed drawings before relying on trial or cleaning results.

  • Identify the fitted contact parts.
  • Confirm utilities and safe isolation.
  • Record any configuration substitutions.
03 / Project note

Maintain the evidence

Changes to screens, seals or working elements can change the product path. Keep maintenance records tied to the configuration used for acceptance.

  • Inspect wear by the supplier’s instructions.
  • Track replacement part identity.
  • Revisit quality checks when configuration changes.
A clearer project conversation